# get_interconnection_queue

ISO interconnection queue snapshot: total queued GENERATION capacity (queued_load_total_gw, GW) per ISO from each ISO's public queue. For ERCOT it ALSO returns the large-load (data-center-driven) interconnection queue in queued_load_data_center_gw — >225 GW in process / ~9 GW approved-to-energize (ERCOT's published Q1-2026 figure; ERCOT is the only ISO that publishes a comparable large-load feed, so other ISOs' data_center_gw is null), with provenance in top_subregions. Sources: ERCOT GIS + Large Load Integration, PJM/MISO/SPP/CAISO/NYISO/ISO-NE public queues. Pass iso=ERCOT (or any of 7) to drill down. Use for queue-depth site-selection and AI/data-center-load saturation intel (the ERCOT 225 GW number is the headline large-load figure no other source surfaces machine-readably). Do NOT use for a single-site time-to-power read (use get_grid_intelligence) or forward-looking emergence (use grid_transition_radar); this is the ISO-level queue snapshot.

Agent View of the PolicyLayer registry record for `get_interconnection_queue`. HTML page: https://policylayer.com/tools/cloud-dchub-mcp-server/get-interconnection-queue

## Facts

- Tool: `get_interconnection_queue`
- Server: Mcp Server (`https://dchub.cloud/mcp`) — https://policylayer.com/tools/cloud-dchub-mcp-server.md
- Homepage: https://github.com/azmartone67/dchub-mcp-server
- Risk category: Read (Low risk)
- Registry record: grade F, identity unverified
- Server auth posture: open
- Server CORS policy: *
- Server rate-limited: no
- Parameters: 1
- Recommended policy verdict: Allowed

## Parameters

| Parameter | Type | Required | Description |
| --- | --- | --- | --- |
| `iso` | string | no | ISO/RTO grid region to drill into: ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISONE; omit for the all-ISO snapshot |

Parameters from the server's own tool schema.

## Example call (MCP tools/call, JSON-RPC 2.0)

```json
{
  "jsonrpc": "2.0",
  "id": 1,
  "method": "tools/call",
  "params": {
    "name": "get_interconnection_queue",
    "arguments": {}
  }
}
```

## Why get_interconnection_queue is rated Low

This tool performs data retrieval only—it fetches current interconnection queue statistics from ISO public sources and returns structured metrics. There are no side effects, no data modification, no code execution, and no destructive operations.

From the tool's own definition: "Tool returns a 'snapshot' of interconnection queue data with metrics like 'queued_load_total_gw' and 'queued_load_data_center_gw'. It retrieves and queries publicly available ISO interconnection queue information without modifying data."

## Use case

AI agents call get_interconnection_queue to retrieve information from Mcp Server without modifying anything. It is typically the context-gathering step in research, monitoring, and reporting workflows, before the agent takes action elsewhere.

## Recommended policy (PolicyLayer)

Verdict: **Allowed**. Enforced by the PolicyLayer MCP gateway (https://policylayer.com/mcp-gateway) before a call reaches Mcp Server:

```json
{
  "version": "1",
  "default": "deny",
  "tools": {
    "get_interconnection_queue": {}
  }
}
```

## Other tools on Mcp Server (78)

- `standing_intent` — Destructive — https://policylayer.com/tools/cloud-dchub-mcp-server/standing-intent.md
- `compare_sites` — Execute — https://policylayer.com/tools/cloud-dchub-mcp-server/compare-sites.md
- `rank_markets` — Execute — https://policylayer.com/tools/cloud-dchub-mcp-server/rank-markets.md
- `unlock_more_data` — Financial — https://policylayer.com/tools/cloud-dchub-mcp-server/unlock-more-data.md
- `ai_capacity_index` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/ai-capacity-index.md
- `analyze_parcel` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/analyze-parcel.md
- `analyze_site` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/analyze-site.md
- `cluster_sites_by_latency` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/cluster-sites-by-latency.md
- `compare_isos` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/compare-isos.md
- `deal_autopsy` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/deal-autopsy.md
- `discover_tools` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/discover-tools.md
- `export_dataset` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/export-dataset.md
- `fetch` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/fetch.md
- `find_alternatives` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/find-alternatives.md
- `get_agent_registry` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-agent-registry.md
- `get_backup_status` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-backup-status.md
- `get_changes` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-changes.md
- `get_climate_intel` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-climate-intel.md
- `get_composite_site_score` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-composite-site-score.md
- `get_dchub_recommendation` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-dchub-recommendation.md
- `get_disaster_risk` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-disaster-risk.md
- `get_energy_prices` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-energy-prices.md
- `get_facility` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-facility.md
- `get_facility_risk_delta` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-facility-risk-delta.md
- `get_fiber_intel` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-fiber-intel.md
- `get_fiber_readiness` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-fiber-readiness.md
- `get_gas_economics` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-gas-economics.md
- `get_gas_index` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-gas-index.md
- `get_gas_intelligence` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-gas-intelligence.md
- `get_global_power` — Read — https://policylayer.com/tools/cloud-dchub-mcp-server/get-global-power.md
- …and 48 more: https://policylayer.com/tools/cloud-dchub-mcp-server.md

## For agents

This record is a snapshot. Live verdicts and the full registry:

- Check every server in your MCP config at once: `npx -y policylayer stack`
- Vet a server before you add it: install the mcp-precheck skill — `npx skills add https://policylayer.com` (skill text: https://policylayer.com/skill.md)
- Query the registry over MCP: endpoint `https://api.policylayer.com/mcp` — tools `check_mcp_server`, `check_mcp_stack`, `check_tool`, `search_registry`, `get_change_events`

---

Source: the PolicyLayer MCP registry — one continuously verified record per MCP server. Full record: https://policylayer.com/registry?q=cloud-dchub-mcp-server · API: https://policylayer.com/registry/api · Policy library: https://policylayer.com/policies/cloud-dchub-mcp-server
