High-risk tools in Hydrata - ANUGA Flood Simulation
2 of the 9 tools in Hydrata - ANUGA Flood Simulation are classified as high risk. This page profiles those tools specifically, with recommended policy actions and the attack patterns that target them.
Every operation listed below is an action PolicyLayer recommends controlling at the transport layer. Open any tool to see the full profile, risk score, and YAML policy snippet.
Tools at high risk
-
retry_runExecuteRetry a failed simulation run. Resets an errored run back to 'created' status and triggers a new package build. The same run ID is reused. Only valid when status is 'error'. Re...
-
start_simulationExecuteStart a flood simulation run for a built scenario. The scenario must be in 'built' status. Returns 202 with the new run. The run transitions through: built → queued → computing...
Attacks that target this class
High-risk tools in any server share these documented attack patterns. Each links to the full case and the defensive policy.