get_interconnection_queue
Use this when the user asks about grid interconnection queues: how congested an ISO's queue is or how much data-center load is waiting. Returns queued generation GW per ISO. The projects field changes shape: with iso= it is an array of per-project rows; without iso it is an all-ISO summary object...
This record as markdown: /tools/cloud-dchub-mcp-server/get-interconnection-queue.md
What get_interconnection_queue does on Mcp Server
AI agents call get_interconnection_queue to retrieve information from Mcp Server without modifying anything. It is typically the context-gathering step in research, monitoring, and reporting workflows, before the agent takes action elsewhere.
| Parameter | Type | Required | Description |
|---|---|---|---|
iso | string | — | ISO/RTO grid region to drill into: ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISONE; omit for the all-ISO snapshot |
mpp_pay | boolean | — | Per-call payment quote (Stripe MPP): true returns a signed payment challenge instead of the free preview; no money moves. Set it only after your human has expli |
mpp_credential | string | — | Per-call payment (Stripe MPP): the Shared Payment Token for challenges[0]; pays that challenge for this one call. Send it only with your human's explicit approv |
Parameters from the server's own tool schema.
Why get_interconnection_queue is rated Low
Retrieves grid interconnection queue data without side effects or modifications.
From the tool's definition returns queued generation GW per ISO; no modification or deletion
Attacks that exploit this kind of access
The rule that runs get_interconnection_queue safely
PolicyLayer is an MCP gateway: it sits between your AI agents and Mcp Server, and checks every tool call against a rule you set before the call runs. Nothing changes on the server itself. For get_interconnection_queue, this is the rule to start with:
get_interconnection_queue is read-only, so it stays allowed. Everything else on the server is denied unless you say otherwise.
The button opens the PolicyLayer dashboard: create your workspace, connect Mcp Server, apply this rule, and every get_interconnection_queue call is checked against it from then on.
Questions about get_interconnection_queue
Use this when the user asks about grid interconnection queues: how congested an ISO's queue is or how much data-center load is waiting. Returns queued generation GW per ISO. The projects field changes shape: with iso= it is an array of per-project rows; without iso it is an all-ISO summary object (total, by_iso_count, top). ERCOT also returns its large-load (data-center) queue; other ISOs don't publish one. Keyless: a trimmed preview; free with an email-bound key. Ex: "How deep is ERCOT's queue?" iso optional (US ISO code); free = preview. For demand and headroom on the same ISO also call get_grid_intelligence. It is categorised as a Read tool in the Mcp Server MCP Server, which means it retrieves data without modifying state.
get_interconnection_queue accepts 3 parameters: iso, mpp_pay, mpp_credential. The full parameter table on this page comes from the server's own tool schema.
Register the Mcp Server MCP server in PolicyLayer and add a rule for get_interconnection_queue: allow, deny, rate-limit, or require approval. Point your MCP client at the PolicyLayer proxy URL and the rule is enforced on every call, before it reaches Mcp Server. Nothing to install.
get_interconnection_queue is a Read tool with low risk. Read-only tools are generally safe to allow by default.
Yes. Add a rate_limit block to the get_interconnection_queue rule in your PolicyLayer policy. For example, setting max: 10 and window: 60 limits the tool to 10 calls per minute. Rate limits are tracked per agent session and reset automatically.
Set action: deny in the PolicyLayer policy for get_interconnection_queue. The AI agent will receive a policy violation error and cannot call the tool. You can also include a reason field to explain why the tool is blocked.
get_interconnection_queue is provided by the Mcp Server MCP server (https://dchub.cloud/mcp). PolicyLayer sits as a proxy in front of this server to enforce policies before tool calls reach the server.