change_order

Change Order Calculator — Priced change order with overhead, profit and revised contract total.

SERVERGateway SOURCEhttps://wingmanprotocol.com/mcp
Low RISK CLASS
Category Read
Parameters 71 required
Recommended Allowedsee the rule below
Registry record Grade F, identity unverified Pull the record →

This record as markdown: /tools/com-wingmanprotocol-agent-gateway/change-order.md

What change_order does on Gateway

AI agents call change_order to retrieve information from Gateway without modifying anything. It is typically the context-gathering step in research, monitoring, and reporting workflows, before the agent takes action elsewhere.

ParameterTypeRequiredDescription
labor_rate number Labor rate per hour in USD
profit_pct number Profit percent on the change
labor_hours number Added labor hours
overhead_pct number Overhead percent on the change
material_cost number Added material cost in USD
original_contract number Yes Original contract amount in USD
schedule_impact_days number Added days to the schedule

Parameters from the server's own tool schema.

Why change_order is rated Low

The tool appears to be a calculator that computes financial figures (overhead, profit, revised contract total) for a change order. It performs calculations and returns results rather than moving money or committing financial obligations. It is likely a read/compute operation with no side effects, similar to other calculators described in the server (board_feet, concrete, etc.).

From the tool's definition Change Order Calculator — Priced change order with overhead, profit and revised contract total.

Questions about change_order

What does the change_order tool do? +

Change Order Calculator — Priced change order with overhead, profit and revised contract total. It is categorised as a Read tool in the Gateway MCP Server, which means it retrieves data without modifying state.

What parameters does change_order accept? +

change_order accepts 7 parameters: labor_rate, profit_pct, labor_hours, overhead_pct, material_cost, original_contract, schedule_impact_days. Required: original_contract. The full parameter table on this page comes from the server's own tool schema.

How do I enforce a policy on change_order? +

Register the Gateway MCP server in PolicyLayer and add a rule for change_order: allow, deny, rate-limit, or require approval. Point your MCP client at the PolicyLayer proxy URL and the rule is enforced on every call, before it reaches Gateway. Nothing to install.

What risk level is change_order? +

change_order is a Read tool with low risk. Read-only tools are generally safe to allow by default.

Can I rate-limit change_order? +

Yes. Add a rate_limit block to the change_order rule in your PolicyLayer policy. For example, setting max: 10 and window: 60 limits the tool to 10 calls per minute. Rate limits are tracked per agent session and reset automatically.

How do I block change_order completely? +

Set action: deny in the PolicyLayer policy for change_order. The AI agent will receive a policy violation error and cannot call the tool. You can also include a reason field to explain why the tool is blocked.

What MCP server provides change_order? +

change_order is provided by the Gateway MCP server (https://wingmanprotocol.com/mcp). PolicyLayer sits as a proxy in front of this server to enforce policies before tool calls reach the server.

More on Gateway, and thousands of servers like it.

Across the catalogue

// THE MCP REGISTRY

PolicyLayer tracks 44,603 MCP servers and 515,000+ tools.

Every server has a live record: who publishes it, whether it answers without auth, its risk grade, every tool classified, the recommended policy. This page is one line of Gateway's. Pull the full record:

Teams ship this data inside their own products. See what a licence covers →