update_contam_project_references

Use this when you need to edit the referenced weather, contaminant, or library files inside a CONTAM .prj file.

Server CONTAM MCP summer521521/contam_plugin
Category Write
Risk class Medium
Parameters 00 required

What update_contam_project_references does on CONTAM MCP

AI agents use update_contam_project_references to create or update resources in CONTAM MCP — usually the action step of a workflow, after the agent has gathered context. Every call changes real data in your CONTAM MCP environment.

Why update_contam_project_references needs a policy

The tool creates or modifies data reversibly by updating project references within a CONTAM project file. While it changes configuration data that affects simulations, these changes are not irreversible (the previous state can be restored or reverted), and the tool does not delete data or execute arbitrary code.

From the tool's definition Tool description states it enables editing of referenced files inside a CONTAM .prj file: 'edit the referenced weather, contaminant, or library files inside a CONTAM .prj file.' This modifies project configuration data.

Questions about update_contam_project_references

What does the update_contam_project_references tool do? +

Use this when you need to edit the referenced weather, contaminant, or library files inside a CONTAM .prj file. It is categorised as a Write tool in the CONTAM MCP MCP Server, which means it can create or modify data. Consider rate limits to prevent runaway writes.

How do I enforce a policy on update_contam_project_references? +

Register the CONTAM MCP server in PolicyLayer and add a rule for update_contam_project_references: allow, deny, rate-limit, or require approval. Point your MCP client at the PolicyLayer proxy URL and the rule is enforced on every call, before it reaches CONTAM MCP. Nothing to install.

What risk level is update_contam_project_references? +

update_contam_project_references is a Write tool with medium risk. Write tools should be rate-limited to prevent accidental bulk modifications.

Can I rate-limit update_contam_project_references? +

Yes. Add a rate_limit block to the update_contam_project_references rule in your PolicyLayer policy. For example, setting max: 10 and window: 60 limits the tool to 10 calls per minute. Rate limits are tracked per agent session and reset automatically.

How do I block update_contam_project_references completely? +

Set action: deny in the PolicyLayer policy for update_contam_project_references. The AI agent will receive a policy violation error and cannot call the tool. You can also include a reason field to explain why the tool is blocked.

What MCP server provides update_contam_project_references? +

update_contam_project_references is provided by the CONTAM MCP server (summer521521/contam_plugin). PolicyLayer sits as a proxy in front of this server to enforce policies before tool calls reach the server.

// LOOK UP ANOTHER SERVER

Every MCP server has a record like this.

Type a name, get the same breakdown: verified identity, auth posture, risk grade, capabilities, recommended policy.

Teams ship this data inside their own products. See what a licence covers →

// GET IN TOUCH

Have a question or want to learn more? Send us a message.

Message sent.

We'll get back to you soon.