Critical-risk tools in Immobilier
3 of the 70 tools in Immobilier are classified as critical risk. This page profiles those tools specifically, with recommended policy actions and the attack patterns that target them.
Every operation listed below is an action PolicyLayer recommends controlling at the transport layer. Open any tool to see the full profile, risk score, and YAML policy snippet.
Tools at critical risk
-
cao_energieDestructiveWHEN someone asks what a house will COST TO RUN, what it costs the climate, or whether it will overheat in summer. From the CAO scene: the heating need by the degree-day method ...
-
cao_nomenclaturesDestructiveWHEN someone needs the SCHEDULES of a house design, as Revit calls them: the door and window schedule (one mark per type, P1 for doors and F1 for windows, with size, sill height...
-
cao_verifierDestructiveWHEN a scene is composed and BEFORE cao_pdf / cao_generer_dxf / cao_rendu / cao_visite_plan / cao_visite_studio — the cheap check that stops a wrong plan or broken 4K visit from...
Attacks that target this class
Critical-risk tools in any server share these documented attack patterns. Each links to the full case and the defensive policy.