get_change_order
[application delivery] 读取部署单使用的物料和工单状态
This record as markdown: /tools/alibabacloud-devops/get-change-order.md
What get_change_order does on Alibabacloud Devops
AI agents call get_change_order to retrieve information from Alibabacloud Devops without modifying anything. It is typically the context-gathering step in research, monitoring, and reporting workflows, before the agent takes action elsewhere.
Why get_change_order is rated Low
This tool retrieves information about deployment orders and their status—a read-only query operation. It accesses existing data without creating, modifying, deleting, or executing operations. The low severity reflects minimal blast radius if misused by an AI agent, as it only exposes visibility into deployment state.
From the tool's definition Tool description translates to 'read deployment order materials and work order status'. The verb '读取' (read/retrieve) and the context of querying deployment metadata indicate data retrieval with no side effects.
Attacks that exploit this kind of access
The rule that runs get_change_order safely
PolicyLayer is an MCP gateway: it sits between your AI agents and Alibabacloud Devops, and checks every tool call against a rule you set before the call runs. Nothing changes on the server itself. For get_change_order, this is the rule to start with:
get_change_order is read-only, so it stays allowed. Everything else on the server is denied unless you say otherwise.
The button opens the PolicyLayer dashboard: create your workspace, connect Alibabacloud Devops, apply this rule, and every get_change_order call is checked against it from then on.
Questions about get_change_order
[application delivery] 读取部署单使用的物料和工单状态. It is categorised as a Read tool in the Alibabacloud Devops MCP Server, which means it retrieves data without modifying state.
Register the Alibabacloud Devops MCP server in PolicyLayer and add a rule for get_change_order: allow, deny, rate-limit, or require approval. Point your MCP client at the PolicyLayer proxy URL and the rule is enforced on every call, before it reaches Alibabacloud Devops. Nothing to install.
get_change_order is a Read tool with low risk. Read-only tools are generally safe to allow by default.
Yes. Add a rate_limit block to the get_change_order rule in your PolicyLayer policy. For example, setting max: 10 and window: 60 limits the tool to 10 calls per minute. Rate limits are tracked per agent session and reset automatically.
Set action: deny in the PolicyLayer policy for get_change_order. The AI agent will receive a policy violation error and cannot call the tool. You can also include a reason field to explain why the tool is blocked.
get_change_order is provided by the Alibabacloud Devops MCP server (alibabacloud-devops-mcp-server). PolicyLayer sits as a proxy in front of this server to enforce policies before tool calls reach the server.
More on Alibabacloud Devops, and thousands of servers like it.
This server
Across the catalogue